Tuesday, December 9, 2008

Harrumph!

This morning I was feeling very frustrated. Most of the outstanding defects have not been rectified, and we'd had no response from Porter Davis since I emailed last Thursday to point out that numerous things still needed fixing.

Then the nice man from Bath Magic turned up as arranged at 8:30, to fix a small chip in our bathroom vanity - but he knew nothing about the stained pantry shelves which also required his attention. And without a work order, he couldn't do the job. *sigh*

On top of that, the bank is still stuffing us around, since they haven't fully funded our loan - there's a small balance to be credited to our account, thanks to a few post-contract variations. And apart from the fact that the extra bit of cash would be welcome right now, we stay on interest-only payments until the loan is fully drawn. We'd really like to be making fortnightly, rather than monthly payments, and paying a little off the principle, thanks very much.... I'm also peeved at them because they've put clearance days on the cheque we deposited the other day. I've NEVER had to wait clearance days! Tuh!

The fencing guy still hasn't finished the job. No panels, no posts at the back and the hole that's slightly on our side of the boundary hasn't been moved.

Then I headed off to a client appointment and got caught up in road works. By this point, bad words were spewing from my mouth like a Tourette's sufferer. I got to the gym and told my client I was in a Bad Mood, at which news she looked a little worried. ;o)

Anyway.... the site supervisor called me this afternoon and he intends to be at the house tomorrow to sort out most of the minor issues, as well as supervise the appliance fit-off and some electrical work that has to be done. He's also faxed a work order through for the pantry shelves and tells me that a couple of other things have been organised. Plus he was about to call the painter too. If it happens as planned, all well and good...

And I just rang and made a formal complaint to the bank. Let's see if that gets some action.

Hmm. I feel better now.

Saturday, December 6, 2008

Shopping is meant to be FUN

This morning we went in search of light fittings. We know what we want, and thought it would be easy. Ha!

First stop was Bunnings. They stock the pendants we want to go over the kitchen bench and the dining table. At least, they allegedly stock them. I've been haunting every Bunnings store within a 15km radius for the past 2 months and nobody has the lights we want, in the colour we want. There's a space on the shelf and one hanging in their display, but no stock.

So we thought we'd ask them to order them in for us. Noooo. They only take orders for "special" items, not stuff they keep in stock. So if they don't ever actually HAVE any stock, how are we supposed to buy the things? Bike Boy got a bit snippy with the girl at the special orders desk and she just looked bemused. Or maybe she was bored, not sure. Obviously, they don't want our money...

For the kitchen bench - there'll be three of these:





Dining table, centred between two downlights. NOT in hideous red though.....a nice white shade:


Next stop was a major lighting store. The assistant there was helpful and knew her stuff, but the one item we decided we wanted today - a largish pendant for the retreat - was out of stock. And no other store had any either. And there were none in the warehouse. They'll have some more some time in January.... *sigh*

All we wanted was one of these:




And on it went.... Shopping with jaw clenched and forehead fixed in a frown is not my idea of a good time. So now we have a change of plans. I'm going to buy the kitchen and dining room pendants online, and just pay the shipping charge. And the retreat light will have to wait till January.

We DID get some cheap oyster lights for the kids' rooms. At least that's something.

Friday, November 28, 2008

And to top it all off:

Most of the keys we were given don't fit! WTF??

*sigh* I'm betting that the deadlock keys are in the site supervisor's pocket, since those were just being fitted as we left this afternoon. But the deadlocks were supposed to be keyed alike to the entry sets. They're not.

Then we have the key to one set of bifolds, but not the other - again, why aren't those keyed alike? And no key at all to the sliding door.

Whatever, at least we can get in. Well, Bike Boy can. I'll be working all day tomorrow and well into the evening, so no time to do anything useful over there anyway. Oh well, Sunday....

Which bank?

I got to my local bank branch, explained to the customer service person that I was there to pick up a bank cheque for the final progress payment on my home loan, which should have been pre-arranged .....and was greeted by blank looks.

OK, last straw! I completely lost it. Through gritted teeth and with raised voice, I told them exactly what I thought of their crappy treatment of their customers and that they'd better sort it out, pronto! I must have looked pretty scary, because everyone took a BIG step backwards.

I suddenly had three people serving me, all running around making phone calls, looking up stuff on the computers and trying to prevent the crazy lady from screaming and scaring the other customers....

What should have taken 5 minutes actually took half an hour to sort out, but eventually, I walked out of there with my cheque in hand. I pity the poor bloke who drew the short sttaw and got to serve me this morning, but that's one of the hazards of working for the Dark Side. I hope they pay him well.

We'll be seriously reviewing our banking arrangements in the New Year. I owe them nothing....


Edit: Actually I owe them rather a lot of $$. But you know what I mean.

Handover pending....

A visit to the house last night showed:

Plaster still not repaired where a light fitting has been moved. Since we can't get in, we don't know, but can guess, that other plaster repairs haven't been done either.
Floor has been cleaned, but very poorly. No evidence of site clean being done, so concrete, rubble etc is still there.
Plumber has not been to sort out the storm water (we were assured he'd be there yesterday). Attempts to repair bent powder coated infill above sliding door have made it worse.
Painter has not been seen yet.
No deadlocks fitted, and we assume that the other fixing items haven't been done either.

Our inspection is at 1:30pm tomorrow. At least our concreter is on the ball - the driveway is all dug out and formed up, ready to pour. And the idiot fencing contractors have concreted in the posts on our side boundary and attached the top rails, so at least that's some progress. We DID have to request that they not pour concrete into the hole where they've trashed the stormwater...a stormwater drain full of cement? Yeah, that'd work well....

Continuing the dramas, I got on my high horse with the bank yesterday afternoon and caused a stir. All I've asked for is confirmation that a bank cheque will be available at our local branch for collection this morning. I asked for this on Tuesday last week. And again on Monday this week. And again on Wednesday. And then again at lunchtime yesterday.

At 3:00pm I lost patience and faxed a complaint, pointing out exactly how bad their service is, and letting them know that if I did not hear for them within the hour, I would be escalating my complaint to the Banking Ombudsman. 59 minutes later, I got a call, masses of apologies, and the whole thing was sorted out pretty quickly. I now have confirmation in writing that our cheque will be waiting for us tomorrow morning at the branch I specified.

Honestly, that wasn't so hard, was it? So why did it take 10 days, 3 faxes, 4 phone calls and a threat to make it happen? I worked for this particular bank for 20 years, so I'm particularly disgusted when their service isn't up to scratch. I told them that a 12-year-old with a piggy bank full of 5 cent coins gets better service in the branches than their "valued" home loan customers. True...

After a few dramas with this current loan, a previous loan and an insurance claim, I'll be taking my business and walking in the new year. Loyalty? Bah! It'd be nice if they demonstrated some!

I wish I could say that had made me feel better, but nope.... rocking up to the house this afternoon and finding everything completed? THAT will make me feel better!

*deep breaths...*

Tuesday, November 25, 2008

Can anybody get ANYTHING right?

We arrived at our block a couple of weeks ago to find that the fencing contractors had marked the ground for post-holes. Way too close to the house on the side boundary. We discovered that they'd lined our side boundary up to the wrong rear peg, using one belonging to a neighbouring block, which was about 2.5m inside our property.

So I ring the contact at the developer's office, who provides me with a number for the fencing contractor. He promises to get his guys to check their measurements. Sure enough, a couple of days later, a nice tall stake, sprayed bright pink, appears next to the right corner peg.

Last night I noticed that the post holes had been dug. Great! Only.....hmm. The ones for the rear boundary seem a little too close to the house. We have a 2m easement along that boundary and only about 145mm clearance from the house to the easement at one corner, but still.... that doesn't look like 2m to me.

This morning I go back, armed with my trusty tape measure and the site plan. Sure enough, the post holes at one end, where the next door neighbour has an existing fence, are correct. But at the other end? Instead of a distance of 2145mm between the rear of the house and the proposed fence, we have only 1800. Looks like over 300mm has gone missing.

I rang the fencing guy again. He argued with me! I insisted. After all, I was standing right there, with my tape measure and the holes were clearly wrong. He sighed and said he'd get the guys to check it. Again.

After I hung up, I found the peg that marks the angle in the fence. It's some distance from where they put the hole. I'm going back in a tick, with a nice bright can of spray paint and a string line, to mark the correct spot.

No way is our rear neighbour getting a free gift of 300mm of our land!

Monday, November 24, 2008

The back story: where was I?

I think we were at lock-up stage or thereabouts. Dodgy frame, dodgy brickwork, dodgy roof. We were still busy complaining about all of that when our supervisor tells us he wants the plasterers to start. Say what? The frame is seriously not right and you want to cover it up with plaster?

We organise a meeting with the construction manager and our supervisor and make it clear that we are Not. Happy. Jan. We point out how the roof line dips away in one corner of the ensuite. How this wall or that aren't plumb. How bulkheads have been framed wrongly. How the wrong timbers have been used in load-bearing walls. How some of the timbers that should have been used have now been cut up to build the frame for our missing entertainment niche. How the roof line is uneven. And so on.

We learn that the frame has failed inspection (gee, really?), but is due for another shortly, and assuming all is OK, the plasterers need to get started so as not to hold things up. *ahem* They assure us that various things will be rectified and we are promised a copy of the frame inspection report thingy, which we request because we no longer have any faith in these promises. We never did get that...

Plaster goes on and walls look woeful. Things start and stop and go nowhere. We get a whole lot more empty promises, and then one day when walking up the street and viewing the place from a different angle, we notice just how bad the roof is. The entire front face looks like (as my husband puts it) "the waves at Bell's Beach".

By this time we've sent numerous emails and made multiple phone calls and got not very far. We start to investigate what the Building Commission can do for us, and how to go about starting a formal complaints process. Then I get a phone call one morning out of the blue from our new site supervisor. NEW site supervisor? First we've heard of it. He wants to have a meeting on site to go over the house with us. I'm at work and suggest he rings Bike Boy, who organises a meeting with the new guy.

New Guy is brought up to speed very quickly and is probably wondering who's bad side he's managed to end up on to inherit this job... he seems appalled at the state of the roof and various other things, and utters several bad words at the workmanship (or lack of...).

One of the first things he does is to have all the plaster in the garage, the entire ceiling throughout the front of the house, along with some sections of cornice elsewhere, ripped down. Then a number of roof trusses are moved. With the tiles on. Err... Still, that results in a marked improvement in the roofline. Other trusses are jacked up and various bits of frame evened out. New Guy also tells us that the frame actually failed inspection FIVE times. And that he has no idea how it passed on the sixth attempt.

We still have issues with tradies. Like this:


In what parallel universe is it acceptable to prop up a roof truss with an old chisel?

There was more of the same, things were happening, but it was all two steps forward, one step back. The plaster was pulled down and re-done more times than we could count. There was so much done wrong, re-done (wrong again), re-done again.....but it would take me a week to list it all.

We had a lot of promises and some action, and this went on for weeks and weeks*. Our biggest beef was that we saw our contract completion date come and go in August and we just could not pin anyone down to a timeframe for actual real-world completion. Work had also seemed to come to a halt; nobody was in a hurry to do anything.

Finally, we looked up the big boss at PD and sent him a terse email, listing some of our issues, the main one being the lack of any kind of timeline. Bike Boy got a call from him first thing the next morning, and Lo! Things began to happen.

By this time it was September and we were fast running out of patience - and cash.


* I have to note here that New Guy was actually getting a lot of things happening and seemed to be making a genuine effort to sort out all the dramas. But he was up against it with tradies who just didn't care (that's if they bothered to show up in the first place) and also in trying to work around the poor-quality frame.

Counting down. Or.....not?

Since our practical completion inspection last Thursday, we've been expecting our house to be a hive of activity, with all hands on deck to meet our confirmed-in-writing handover date THIS COMING FRIDAY.

We left on Thursday arvo feeling reasonably hopeful that our nightmare was soon to end; almost cheerful in fact. On Friday morning, I looked up the street as I drove past on my way to do the school run....but there was no sign of anything happening. Oh well, it was only 8:00am. I was back just before lunch - still nobody there. Walked over later in the afternoon. Nope, all was quiet.

Saturday, nobody turned up. Sunday - bah! As if....! Today, I stopped on my way home from work, walked all around (in the mud) and peered in every window. The roof has not been fixed, the little red dots are still all over the place, exactly where they were on Thursday, and nothing, NOTHING has been done. Zero. Zilch. Zip. Three days completely wasted. Grrr.

Now they have three days left to complete everything before handover. What do you think the chances are of that happening?

I've busted my butt the past few days, organising insurance, gas and electricity accounts, blinds, steam cleaning (for the rental), all on the assumption that we would have possession at the end of this week. The flooring guy is booked for Monday to start on our floating floors, the carpet all organised for the week after, fences are going up and the concreter is ready to start the driveway any day. Just that one tiny detail to take care of....the keys?

We will not be handing over any money if the major things aren't completed, no matter how much pressure we may be under in terms of our housing situation. Call me cynical, but I think perhaps some large builders count on clients being in financial doo-doo, thanks to delays, and therefore being willing to settle for below-par work, just to get the keys.

Not us, nuh-uh. VCAT may be in our future yet....